A prototype budget is the sum of each part's quantity times its unit price, plus explicitly recorded extra costs and any allowance you choose for revisions.
The starting row and prices are illustrative. Replace them with your own quantities and dated estimates. Use the same currency for every input; this planner displays INR.
Calculated in your browser. Entries are not uploaded or saved; download your CSV before leaving this page. Up to 30 items. Round-off in displayed rows may differ slightly from the unrounded total.
Parts subtotal = sum of quantity x unit price for every line. Revision allowance = parts subtotal x allowance percentage / 100. Planning total = parts subtotal + revision allowance + other costs.
Four example components at INR 50 each give INR 200 of parts. A 10% revision allowance adds INR 20. If other costs total INR 100, the planning budget is INR 320. These figures are illustrative and are not lab or supplier prices.
Add the amounts you have separately estimated for shipping, tax, consumables, fabrication or outsourced work. The calculator does not infer tax rates, delivery fees or machine charges. Avoid entering the same cost in both an item row and the other-cost total.
The CSV includes each item, quantity, unit price, line total and the budget summary. Add supplier links, quote dates, procurement owners and revision information in your spreadsheet. Fractional quantities support material lengths or weights; keep the unit consistent with the quoted unit price.
No. It is a planning choice you enter, applied to parts only. It does not estimate a failure probability or guarantee that the budget will cover a redesign. The file is an estimate rather than a purchase order or invoice.
Next: build a complete prototype BOM, write the project brief, or use the filament material estimator for a separate raw-material line.